Who may file the permit
Section 11-4-8(B) says no permanent or temporary fence shall be erected, constructed, or installed without a fence permit from the zoning administrator. The Building Permits page says the applicant is the owner of record or the registered contractor doing the work. Either of those can be the applicant. A company that says only it can file, or that you cannot file, is describing its own practice. Confirm the current rule with the village.
The brochure in the current packet says permits must be obtained before construction, and to allow at least 10 working days for review. Read that as about two weeks, and confirm the timing. The addendum calls for a final inspection with 24 hours’ notice. The permit guide is the height table, the materials, and the checklist. This page does not repeat every row.
The contractor registration bond
The contractor registration application lists a $20,000 surety bond, and Fence is one of the trades on that application. The bond is a contractor registration requirement. It is not a homeowner charge for the fence, and it is not proof that a particular job was approved.
The registration fee on that form is left off this site because the form used for this reading was undated. Confirm the contractor’s registration with the village. This site does not look up registrations and does not claim one. A website that says it is registered is not the village’s list.
The association letter, when one applies
The supplemental checklist asks for a homeowners association approval letter when applicable. The Building Permits page says that if you live in an area with a homeowners association, an approval letter must be submitted. The letter rides with the permit. It does not issue the permit, and a village permit does not approve you with the association.
This site names no association and states no association rule. The HOA page is that limit. Ask the estimate to say whether an association letter is included in the scope or left for you to get. CMAP’s June 2026 snapshot lists 2,218 single-family attached homes, 19.2 percent of units, which is why the question comes up. That share is not a map of who owns a fence.
What a written scope should name
The village does not publish a form called a written scope. The useful comparison is still a page that names the work in the same words the permit will use. Ask for the linear feet, the height, the yard (rear, interior side, or corner side), the material, the color, and the gates. Ask who marks the fence on the plat, who files, and who meets the inspector.
Match those lines to the code before you compare prices. Posts at least one-third of their length in the ground, holes at least 24 inches deep, finished face out toward neighboring homes and streets, no plywood, and closed fences at least 1 inch above grade are village rules, not upgrades. If the fence is painted or stained, the color list is white, black, gray, brown, or redwood. A corner lot should say how the 10-foot building-line limit is drawn. That drawing is on corner-lot fences. Vinyl, wood, and chain link are the material pages.
Contact JULIE through illinois1call.com before any digging. This page does not print a dig number. An estimate that skips the locate is not a complete install plan.
Price, and the fee the village sets
The village sets the fence permit fee and confirms the amount when the permit is approved. Check the village Building Permits page. No fee figure is printed on this site. A national cost article is not that schedule. The Building Permits page is the link.
Fixr, updated January 31, 2025, lists a typical project of $3,000 to $7,000 for 200 linear feet of 4-foot cedar picket with a gate, and an average of $4,500. Angi, updated August 3, 2026, is a separate publisher. The cost guide keeps every row with its source and date. This page does not average them and does not turn a corner lot into its own total. Prices vary. A free estimate gives the real number.
Use the contact form or estimates@glendaleheightsfence.com. The request is free. It does not hire anyone and it does not file a permit. Say the village, the fence type, and whether the lot is a corner.
Nearby towns
Glendale Heights Fence takes free estimate requests in these places. Each one has its own section on the service area page. Name the place on the form.
FAQ
Does the surety bond mean the village approved my fence?
No. The contractor registration application lists a $20,000 surety bond, and Fence is one of the trades on that application. The bond is a registration requirement. It is not a homeowner charge and it is not approval of a particular fence. Confirm registration with the village.
Who can apply for the fence permit?
The Building Permits page says the applicant is the owner of record or the registered contractor doing the work. Ask the written estimate which of those will file. The permit is still required under §11-4-8(B).
Does an HOA letter replace the village permit?
No. When an association applies, the village asks for the letter with the permit. The letter does not issue the permit. A village permit does not approve you with the association. This site states no association’s rule.
What should the written estimate include?
Length, height, yard, material, color, gates, who marks the plat, and who files. Posts, the finished face, and the gap above grade are village rules to look for on that page. The village does not publish a document by the name written scope. Compare the lines anyway.
How much is the Glendale Heights fence permit?
The village sets the fence permit fee and confirms the amount when the permit is approved. The Building Permits page is the link. This site does not print a figure.
Sources
- Glendale Heights Zoning §11-4-8, Zoneomics mirror Re-opened October 12, 2026. Amended through Ord. 2021-51 on the fence section. Permit, materials, heights, corner lots, netting, nonconforming fences, and the one-inch drainage rule.
- Village of Glendale Heights, Fences packet Fence Permit Addendum and checklist, Rev 05/2020, as read for this plan. Colors, post depth, HOA letter, and the final-inspection notice.
- Village of Glendale Heights, Building Permits Applicant is the owner of record or the registered contractor. HOA approval letter when applicable. Adopted 2021 codes and the 2024 Illinois Energy Conservation Code, as listed on that page.
- CMAP Community Data Snapshot, Glendale Heights (June 2026) ACS 2020–2024. Units in structure, year-built buckets, tenure, and median household income as printed.
- Illinois 1-Call (JULIE) Call before you dig. This site does not print a dig number.
- Fixr, fence installation cost Updated January 31, 2025. Figures are quoted from that page, not averaged with Angi.